Skip to main content

Products

grad

Quick-Pig - Access to Rising Main without manhole

Reinert-Ritz GmbH Stand: J76

Meet the award winning Quick-Pig for rising mains


With the Quick-Pig Station you will reduce the amount of workload and simplify your quality assurance.


• Cleaned & blockage free pipes reduce energy consumption due to increased pump activities.

• Occupational health & safety is increased by avoiding a possible descent into a shaft (no more venting necessary, less specialised PPE required, etc.)

• No abrasion or damage to the pipes during the cleaning process

• Guaranteed removal of waste without manhole construction & reduced labour.

• Quick inspection and cleaning of the wastewater pipes, so that there are no disruptions to day-to-day operations.


Another highlight that makes the station so unique is that no manhole structure needs to be built, as the product is designed for normal underground installation, which means that all work can be carried out from ground level. This means the health and safety benefits are huge when using the Quick-Pig System for General Pigging, Ice Pigging or Flushing, making it the safest option for anyone carrying out routine inspections/maintenance or cleaning.

It also eliminates all the renovation costs you would have with a concrete shaft.


The Quick-Pig offers another option, a combined solution with aeration and ventilation valve can also be installed in every pigging station so that you do not have to install any additional ventilation shafts or valves.

Loading