Skip to main content

Brochures

grad

Anping New Water Plant Design-Build-Operation Project

“Industry Briefing for Tainan Aping Reclaimed Water Plant Design-Build-Operate(DBO) Project”. The DBO project included the construction of a UF/RO plant on the 37,500 CMD treated effluent used by nearby industries. The total budget is 449 million USD (included tax). 

It is scheduled to hold on the May 23rd, 2018 at 12:30 pm at Hilton Birmingham Metropole Salisbury Room – The event is specifically put together for potential tenders/contractors as a means for better understanding and responding to requirements of the DBO project and for showcasing Taiwan’s investment market. The venue is located near the Utility Week Live 2018 in Birmingham. Feel free to enjoy the exhibition in the morning and come to the Industrial Briefing in the afternoon. Please see the attachment for the invitation. 

The event will start with the opening and introduction from the Chief Engineer of Tainan city Water Resource Bureau and will progress to an overview of the DBO project – we hope to provide Tenderers with context and background information in relation to the Tender Documents, the tender process, and the DBO project scope.

This event will also provide an opportunity for networking and interacting colleagues in the water industry and your presence will absolutely take the event to different heights and it will be an encouragement for all of use.

Download
Loading